Negative prices at midday: what they actually mean

Negative prices at midday: what they actually mean

Check AEMO’s dashboard most sunny days around 11am to 2pm on a mild day in spring or autumn and you’ll find swathes of the NEM sitting below zero, sometimes well below it. South Australia will often be the worst offender, Victoria not far behind, and on the right day even Queensland joins in. This isn’t […]

Home battery payback: does it stack up yet

Home battery payback: does it stack up yet

A client in Brunswick sent me her retailer’s battery quote last week with a one-line message: “This says 6.2 years. Does that sound right to you?” It didn’t. Not because the installer was being dishonest, but because the spreadsheet behind that number assumed she’d use every spare kilowatt-hour of stored solar every single day, discharge […]

Rooftop solar versus a home battery: which pays back first

Rooftop solar versus a home battery: which pays back first

A client in Alphington rang me last month wanting a quote for a 10kWh battery to bolt onto a six-year-old 6.6kW solar system she’d never really upgraded. She’d been told by a sales rep the battery would “pay for itself” in six years. On the numbers I ran off her actual NMI export data, it […]

Rooftop solar, minimum demand and the midday problem

Rooftop solar, minimum demand and the midday problem

Just after 12:30pm on a clear Saturday in late October, operational demand on the South Australian grid dipped below zero. Not low – below zero. AEMO’s own data on minimum demand events shows this isn’t a one-off curiosity anymore; it’s a recurring feature of a mild, sunny weekend with everyone at the beach or the […]

5B’s Maverick panels: prefab solar that skips the roof

5B's Maverick panels: prefab solar that skips the roof

Walk a standard ground-mount solar farm under construction and you’ll see crews on their knees for weeks, torquing bolts into pile-driven steel, one row at a time, in whatever weather shows up. Walk a 5B site and you see something closer to a warehouse floor rolled out across red dirt: pre-wired frames that unfold like […]

SunDrive’s copper cell bet and the long road to Kurri Kurri

SunDrive's copper cell bet and the long road to Kurri Kurri

Every solar cell made today carries a little sliver of silver screen-printed across its front and back, the fine metal fingers that pull current off the silicon and into the wiring. It’s a tiny amount per cell, grams really, but multiply that across the roughly half a terawatt of modules the world fits every year […]

The Consumer Energy Resources roadmap: what it means on your roof

The Consumer Energy Resources roadmap: what it means on your roof

Three export limit changes in four years on the same switchboard. That’s what a client in Pascoe Vale has now had done to her system since 2022, each time because a different rule arrived from a different direction: the distributor’s dynamic connection trial, then a static export cap, now a flexible export arrangement tied to […]

Home battery payback: does it stack up yet

Home battery payback: does it stack up yet

I had a client in Reservoir last month pull out a quote with a 14-year payback on a 10kWh battery, printed in the same friendly sans-serif font as the 6-year payback quote sitting next to it from a different installer, for the same house, the same roof, the same usage profile. Two installers, two spreadsheets, […]

Rooftop solar versus a home battery: which pays back first

Rooftop solar versus a home battery: which pays back first

Last month I sat at a kitchen table in Blackburn with a couple who’d just been quoted $4,200 for a 6.6kW solar system and, separately, $11,500 for a 10kWh battery to go with it. They wanted one number: which one pays for itself first. That’s the wrong question, but it’s the one everyone asks, so […]

5B’s Maverick panels: prefab solar leaves the roof behind

5B's Maverick panels: prefab solar leaves the roof behind

A standard 1MW ground-mount array takes a crew of six roughly two to three weeks to rack, wire and commission, assuming the ground’s cooperative and the weather is too. 5B says its Maverick system does the same job in two to three days, with a smaller crew and a fraction of the concrete. That’s not […]